Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Была более двух недель назад

Женщина, 46 лет, родилась 20 августа 1979

Атырау, готова к переезду, готова к командировкам

Suitable position

Специализации:
  • Переводчик

Тип занятости: полная занятость

Опыт работы 18 лет 8 месяцев

Февраль 2021Июнь 2021
5 месяцев
Sicim
Planning/Productivity Engineer
- Prepare and update Progress Measure Schedule based on the Contract and Job Pack issued by Client. - Monitor work progress and prepare the weekly progress report for Client. - Monitor and record update of site work progress according by Construction Manager. - Approval and acceptance of Client and sub-contractors for settlement - Participate in Client progress meetings. - Prepare and monitor Tracking sheet according Pipeline and Piping drawings and work with Construction Welders and Supervisors.
Июнь 2019Октябрь 2020
1 год 5 месяцев
Isker
Work Pack Supervisor/Workface Planner
- Responsible for the conversion of Construction Work Packages (CWP) into Installation Work Packages (IWP) - Responsible for insuring that all necessary resources are available and constraints are removed prior to releasing the IWP to the field. - Participation in project front-end planning and therefore ensures continuity and integration of the work packaging structure between phases. - Ensuring the timely issuance of a complete and constructible Installation Work Packages (IWP) that support and are in line with the construction schedule. - Developing/improving IWP templates - Preparing project IWP (determining required activities, resources, quality control, risk planning, interdependencies, interfaces, special requirements, field condition etc.) - Reviewing and monitoring IWP creation process for completeness and accuracy - Monitoring and controlling IWP and advising appropriate parties - Coordinating IWP execution with field supervision, resource coordinators, project controls, quality assurance, engineers, other planners, and operations personnel - Conducting IWP close-outs - Continuously tracking of the project and preparing required (Production and Execution) reports as per contract.
Декабрь 2018Июнь 2019
7 месяцев
Sicim
Work Pack Engineer
Workpack and Permit To Work PTW/ Prepare Method Statement. Turnaround 2019
Октябрь 2016Февраль 2017
5 месяцев
Project Engineer
- Provided project management for a few of Contractors: scope, schedule and budgets for specific Infrastructure projects - Was involved in project strategies, contracting plans, executing plans for Engineering, Procurement and Construction - Worked on project design deliverables for mechanical, civil and electrical job packages related to Infrastructure projects
Ноябрь 2015Октябрь 2016
1 год
NCOC
Lead Piping Engineer
- Supervision and support of 8 design engineers during the execution of design, procurement and construction activities, ensuring the quality of the work according to the contract requirements
Ноябрь 2014Ноябрь 2015
1 год 1 месяц
Piping Engineer
- Supervised 7 off design engineers in coordination of Tie-in work process and issued more than 80 of Tie-in Jobpacks (for Turnaround and Enabling Works)
Декабрь 2013Июль 2014
8 месяцев
PSN Woodgroup Sakhalin
Senior Piping Designer
- Performed piping design Isometric and General Arrangement Drawings in AutoCAD & PDMS - Prepared bills of materials related to drawings - Checked drawings produced by other design engineers, and ensured that the quality of work is acceptable and in comply with the Client’s standards & requirements
Октябрь 2006Декабрь 2013
7 лет 3 месяца
PSN Woodgroup
Senior Piping Designer
Was responsible for Piping Job Packs issue according Inspection Reports for EFF Engineering Group TCO Job Packs: replacement, inspection and excavation of defected parts of pipeline with new section
Июль 2006Октябрь 2006
4 месяца
KAZGIPRONEFTETRANS
Piping Design Engineer
- Was responsible for developing the design concepts of HVAC systems and review the HVAC documents to ensure the compliance with commissioning standards and specification
Февраль 2002Июль 2006
4 года 6 месяцев
CASPIMUNAIGAZ DESIGN/ENGINEERING INSTITUTE
HVAC/PIPING ENGINEER
- Preparation of HVAC Data Sheet & Piping Systems - Preparation of Piping Layouts, Single Line Diagrams for both Piping Systems - Design & Selection of HVAC Equipment like Air Valves, Cooling Tower Selection, Water Generator, Chimney, Pumps, Cooling Towers - Document Control duties
Август 2000Февраль 2002
1 год 7 месяцев
ATYRAU STATE PEDAGOGICAL UNIVERSITY
Teacher of drafting and design
Teaching the drafting and design

Обо мне

AN ADAPTABLE AND RESPONSIBLE WITH GOOD COMMUNICATION AND ORGANIZATION SKILLS. I ENJOY WORKING ON MY OWN INITIATIVE OR IN A TEAM. *WhatsApp call only!

Высшее образование

2006
Высшее образование
ATYRAU OIL AND GAS INSTITUTE
Oil and Gas Development , Bachelor in Oil and Gas Fields Development
2000
Высшее образование
ATYRAU STATE UNIVERSITY
Pedagogical , Bachelor in drafting and design

Знание языков

Казахский — Родной

Английский — C1 — Продвинутый

Русский — C2 — В совершенстве

Турецкий — C1 — Продвинутый

Повышение квалификации, курсы

2017
2017 | Italian Language Course (Milan, Italy)
Self-education, Foreign language
2015
Project Management Essentials for Discipline Leads (KZ)
Fluor Corporation, Project Management
2013
CADWorks, AutoCAD, PDS 3D (KZ)
Woodgroup Company, Project Management
2010
English Language Course (London, UK)
Self-education, Foreign language
2008
Turkish Language Course (Istanbul, Turkey)
Self-education, Foreign language
2005
2005 | Pipe Stress Analysis, Caesar II, PDS Piping & Equipment, PDS 3D Modeling (Mumbai, India)
Petrofac Company, Project Management

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения