June 2022 — currently
3 years 11 months
LLP "Interеasсo"
Atyrau
Construction, Real Estate, Architecture... Show more
Construction manager for mechanical
Construction Manager (Mechanical & Piping)
Project: 1BCMA Tie-in – TP01/02/03/04/05/07/10 – ISKENE
Scope: Major overhaul of technological pipelines
Project: NWTF (New Water Treating Facilities)
Scope: Installation, welding, and commissioning of tanks using plate-by-plate assembly method
Key Responsibilities:
-Planning, management, and execution of general and mechanical works;
-Supervision of work completion to ensure quality and compliance with standards;
-Handover of completed works to state inspection authorities;
-Ensuring compliance with safety regulations;
-Participation in commissioning and preparation of technical documentation;
-Quality control during equipment installation at the site;
-Preparation of progress reports, issuing non-conformance reports when required, and implementing corrective actions until full compliance and acceptance.
Construction Manager (Mechanical & Piping)
Project: Tengiz Field – Modernization of the Caustic Water System at KTL Facility
Key Responsibilities:
-Management and coordination of installation works for process pipelines and mechanical equipment;
-Monitoring of project schedules, safety compliance, and work quality;
-Interaction with the client, project supervision, and technical inspection;
-Preparation and maintenance of as-built documentation;
-Organization of workforce and subcontractor activities;
-Preparation of progress reports and handover of completed works for commissioning.
Construction Manager (Mechanical & Piping)
Project: Kyzylorda – AKSA Energy Kyzylorda 240 MW CHP Plant
Key Responsibilities:
-Supervision and coordination of mechanical and piping installation works;
-Organization and control of production tasks within scheduled deadlines;
-Development and adjustment of work execution schedules;
-Monitoring compliance with occupational, industrial, and safety standards;
-Inspection of completed works for compliance with design and technical documentation;
-Preparation and maintenance of technical, as-built, and reporting documentation;
-Participation in testing, flushing, and commissioning of equipment and pipelines;
Coordination with the client, technical supervision, and related departments;
Supervision of equipment and material deliveries, inspection, and acceptance;
Management of section personnel (fitters, welders, foremen, supervisors);
Optimization of manpower and material resources, ensuring efficient equipment usage;
Participation in project meetings, progress reporting, and final handover of facilities for operation.
February 2022 — February 2024
2 years 1 month
LLP PSI ENGINEERING
Almaty, www.psi-group.kz/ru/
Metallurgy, Metalwork... Show more
Senior piping engineer
Design.
According to the requirements of the project, SNiP RK and ASME other standards.
March 2021 — January 2022
11 months
"Industrial Construction Group" LLP
Aktogai, www.kazminerals.com/ru/our-business/aktogay/
Construction, Real Estate, Architecture... Show more
Pipeline Superintendent
Project: Aktogay Expansion Project Supplied Plant Expansion of Actogay GOK Processing
Factory Sulphide Ores.
- Follow the production instructions of KAZ Minerals Projects BV (KPBV) and Industrial Construction Group (ICG), assisting the management of the project and construction team.
- Control over the quality of work in the installation of equipment at the facilities.
- Control of all necessary drawings, specifications, instructions.
- Ensure that the work is carried out in accordance with the approved project plan.
- Control of the performance of the work in accordance with the requirements of the contract and contractors' procedures as well as the technical conditions approved by the client.
- Control, test and adapt static and rotating equipment.
- Monitoring and checking of piping welds and flange joints.
- Control and test work for strength and stress analysis of pipe joints, supports, equipment.
- Control of equipment and pipe elements in accordance with the design drawings and standards of the RK SNIP and ASME of other standards provided by the project.
- Control and coordination with customers and contractors of technical tasks related to construction activities, including engineering research assignments.
- Creating safe and health-friendly working conditions and complying with environmental legislation.
- Daily report of completed works' if necessary, issue reports on non-compliance and ensure the implementation of corrective measures and their monitoring until the inconsistencies and acceptances are completely corrected.
- Ensuring that the company's health and safety procedures are implemented and kept in working order throughout the project.
- Monitoring 'checking and auditing quality records' keeping a database of statistics and compiling reports.
- Compliance with HES, safety regulations extending to specific sites.
- Monitoring the use' of the implementation and registration of project materials by the contractor.
- Control of the contractor's current executive documentation.
- Confirmation of the contractor's executive documentation.
- Taking steps to comply with the timely execution of work in accordance with the approved plan and schedule of work.
September 2020 — March 2021
7 months
"Industrial Construction Group" LLP Ayagoz
Aktogai, www.kazminerals.com/ru/our-business/aktogay/
Construction, Real Estate, Architecture... Show more
Mechanical supervisor
Project: Aktogay Expansion Project Supplied Plant Expansion of Actogay GOK Processing
Factory Sulphide Ores.
- Follow the production instructions of KAZ Minerals Projects BV (KPBV) and Industrial Construction Group (ICG), assisting the management of the project and construction team.
- Control over the quality of work in the installation of equipment at the facilities.
- Control of all necessary drawings, specifications, instructions.
- Ensure that the work is carried out in accordance with the approved project plan.
- Control of the performance of the work in accordance with the requirements of the contract and contractors' procedures as well as the technical conditions approved by the client.
- Report on completed works' if necessary, issue reports on non-compliance and ensure the implementation of corrective measures and their monitoring until the inconsistencies and acceptances are completely corrected.
- Ensuring that the company's approved procedures are implemented and kept them in working order throughout the project.
- Monitoring 'checking and auditing quality records' keeping a database of statistics and compiling reports.
- Compliance with HSE regulations extending to specific sites.
- Monitoring the use' of the implementation and registration of project materials by the contractor.
- Control of the contractor's current executive documentation.
- Confirmation of the contractor's executive documentation
- Taking steps to comply with the timely execution of work in accordance with the approved plan and schedule of work.
May 2017 — September 2020
3 years 5 months
ТОО PSI Stroy Industriya
Atyrau, www.psi-group.kz/ru/
Construction, Real Estate, Architecture... Show more
Process Pipeline Supervisor
- Monitoring of all piping and welding operations (assembly verification, manufacturing and installation);
- Manual and control of cutting, installation of material in preparation for welding.
- Planning, management and implementation of general and mechanical work on pipelines.
- Monitoring the availability of all necessary drawings, specifications, operating instructions.
- Control over the supply of construction and welding materials.
- Participation in checks on the correctness of pipeline assembly procedures.
- Monitoring the implementation of work after its completion to maintain quality, the transfer of work to state supervisory authorities.
- Taking measures to comply with the timely execution of work in accordance with the approved work plan and schedule.
- Compliance with safety rules.
- Responsibility for the implementation and compliance with WRAP (risk assessment), PTW (work permit).
- Interaction with other departments of production in order to ensure the best result of the work.
May 2013 — May 2017
4 years 1 month
KAZOILSERVICE LLP
Shymkent, kz.bizorg.su/shyimkent-rg/c547802-kazoylservis-too.
Power Industry... Show more
Welding Foreman
- Asian gas pipeline. Increasing the capacity of the Kazakhstan-China gas pipeline Foreman of welding and installation works
- Construction of the Asian gas pipeline. Increasing the capacity of the Kazakhstan-China gas pipeline
- Preparation and submission of daily and weekly reports to the construction coordinator.
- Certification and tolerance tests of welders.
- Carrying out procedures is allowed and certification of welders, specialists of welding production and organization before starting work.
- Registration of welding documentation according to the results of work performed - monitoring compliance with the technological modes of the welding process, the rules for the technical operation of equipment and the safe conduct of welding operations.
- Control of storage conditions, preparation and use of welding materials determined by the requirements of regulatory documents
- Participation in hot work to insert the site into the linear part; Work with drawings and projects, calculation and delivery of monthly orders of completed work, distribution of KTU (labor participation rate) among distinguished workers, daily safety training, taking workers a test for prof. suitability and upgrades.
July 2009 — September 2012
3 years 3 months
SAUDA Limited Liability Partnership
Solnechny
PTD engineer
- Production and Technical department Maintaining documentation for welding control of documents in accordance with the requirements of the project, SNiPs of the Republic of Kazakhstan and ASME of other standards provided by the project.
September 2006 — November 2009
3 years 3 months
NTS-ENERGY Limited Liability Partnership LLP
Atyrau
PTD engineer
- Production and Technical department Maintaining documentation for welding, control of documents in accordance with the requirements of the project, SNiPs of the Republic of Kazakhstan and ASME of other standards provided by the project.
Skills
Skill proficiency levels
Driving experience
Driver's license category B, C
About me
Welding, installation, Monitoring of all piping and welding operations, Driving experience, Oil & Gas
Technical and pipeline experience:
• Inspection of Piping Drawings (P&ID, Isometry, Axonometry, Detail Drawings and Supplier Drawings)
• Priority activities to most effectively meet project schedule requirements.
• Prepare and review piping specifications in accordance with company standards and general guidelines.
• Solving a problem in production.
• Experienced tube assembly manufacturer, installation, line inspection, pipeline cleaning, field testing
Higher education
2009
Higher education
South Kazakhstan University
Oil and Gas, Drilling of Oil and Gas Wells
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter