Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 44 years, born on 27 June 1980

India, willing to relocate (Azerbaijan, Georgia, Kazakhstan, Russia, Uzbekistan), prepared for business trips

Electrical Supervisor

300 $ in hand

Specializations:
  • Other

Employment: full time, project work, work placement

Work schedule: full day, shift schedule, remote working, rotation based work

Work experience 23 years 5 months

May 2017currently
7 years 11 months
Worley Parsons Oman Engineering LLC

Other regions

Senior Electrical Engineer(PMC)
Responsibilities:  Ensure full compliance with HSE procedure, Risk Assessment and implementation of safety rules in compliance with safety standards.  Approve and monitor Permit to work system on site, Isolation & Lock out Tag out (LOTO) procedures and ensuring total compliance as an Issuing authority.  Monitoring & review QA/QC requirements are determined and satisfied throughout all phases of project execution and comply with specifications, applicable codes & standards.  Issuances of NCR to the contractor if the relevant activity is not comply with project specifications/procedures or deviation of specifications/procedures & close-out after corrective action.  Supervise the site construction/installation of work of relevant E&I disciplines of assigned Construction contracts and ensure that the work is carried out in safe manner and in compliance with Scope of Work, approved Engineering Standards and Specifications.  Supervise & monitor site E&I construction activities to ensure that discipline related activities including material and equipment receipt, storage and installations are accomplished in full compliance with the HSE procedures, applicable project specifications and quality standards.  Technical review & coordination of Engineering IFC/AFC Drawing, Method Statement, Risk Assessment/JSA, Constructability reviews, Vendor documents, Project Specification/Procedures.  Supervise and review contractor construction/commissioning plan & schedules, report generation of daily/weekly progress achievements, three week look ahead project schedule.  Technical support and optimization among the various construction/commissioning activities.  Familiar with various client’s Project Completion System (e.g. EDAM, Orbit, Petro-PCS, SICON, GOCCM, OPERCOMM, Set route etc.)  Witnessed SAT of electrical equipments like transformer, switchboard (PMCC/MCC), Distribution board’s(DB’s), Junction Boxes(JB’s), generators, motors, power/control cables, earthing & lighting system, HVAC System during pre-commissioning/commissioning stage.  Witnessed PMCC/MCC Loop check, Coordination with Vendor representative during pre-commissioning, commissioning and start-up logic check test for DCS and ESD System.  Witnessed uncoupled no load Test (Solo Run Test) of all process areas HV/LV motors in accordance with Vendor/project specification.  Witnessed Functional & Performance Test of E&I equipments and System/Sub-system wise during commissioning stage.  Review and endorse red line marked up and “As built” drawings.  Performed System/Sub-system walk down of E&I discipline and preparation/clearance of punch list.  Ensure and follow up completion and clearance of all Punch List items.  Review E&I System/Sub-System Construction Completion (CCC)/Mechanical Completion (MC)/ Ready for commissioning (RFC) & Ready for start-up unit (RFSU) Dossier and approved completion Certificate.
November 2016April 2017
6 months
Petrofac International LLC

Other regions

Electrical Supervisor
Responsibilities:  Ensure that all Electrical construction work is carried out in accordance with Permit to Work procedures, project drawings, project priorities and identify and correct any deviations.  Carry out electrical activities site inspections at per inspection and Test Plan to monitor the quality of work being performed at the site.  Ensure materials and equipment are compliant with the specifications and that inspections and tests are conducted and recorded to prove compliance.  Supervise & Monitor electrical activities and maintain alignment with client's requirements and specifications.  Liaise and attend meeting with sub-contractor on progress, delays, and quality and safety issues.  Prepare daily/weekly construction report of job progress report & three weeks look-ahead schedule.  Compiling “As Built” drawing to reflect changes implemented during construction activities.
February 2015September 2016
1 year 8 months
SPIE Oil & Gas Middle East LLC(Client-Eni Iraq B.V.)

Iraq

Electrical supervisor(PMT-PMC)
Responsibilities:  Compliance for issuance of PTW, direct and supervise contractor's Team to ensure adherence to the PTW conditions including HSE procedures.  Participate in Safety walk downs and implement corrective actions.  Monitor the Safety of all personnel, equipments on project sites associated with daily construction/commissioning activities and immediately take corrective action.  Monitor the Quality of the Construction activities to Ensure Compliance with Project Standards, and Project approved Construction/Commissioning Drawings.  Supervise, monitor & control the commissioning & start-up activities are performed in line with client’s specifications & procedures, good industry practices & safe operation of plant.  Review commissioning plans and schedules, procedures including method statements and JSAs.  Review and subsequently endorse construction/commissioning work progress by the contractors.  Familiar with various client’s Project Completion System (e.g. EDAM, Orbit, Petro-PCS, SICON, GOCCM, Set route etc.)  Participate and witnessed electrical equipment Site Acceptance Testing (SAT) like transformers, switchboard (PMCC/MCC), Distribution board’s(DB’s), Junction Boxes(JB’s), generators, motors, power cables, earthing & lighting system, HVAC System during pre-commissioning/commissioning.  Witnessed MCC Loop check, Coordination with Vendor representative during pre-commissioning, commissioning and start-up logic check test for DCS/ESD System.  Witnessed uncoupled no load Test (Solo Run Test) of all process areas HV/LV motors in accordance with Vendor/project specification.  Witnessed Functional & Performance Test of Electrical equipment & system during commissioning.  Compiling “As Built” drawing to reflect changes implemented during construction & commissioning activities.  Performed System/Sub-system walk down of E&I discipline and preparation/clearance of punch list.  Post commissioning activities include system handover, completion of as-built drawing and project documentation.  Verify all tasks have been performed and the punches be closed to get the Achievement of Commissioning of each System/Subsystem.  Review E&I System/Sub-System Construction Completion (CCC)/Mechanical Completion (MC)/ Ready for commissioning (RFC) & Ready for start-up unit(RFSU) Dossier and approved completion Certificate.  Supervise & monitor punch list coordinator for integration in Project Punch List System.  Assist operation team during plant start-up activity for safe operation of plant operation.
August 2013August 2014
1 year 1 month
Nama Mott MacDonald(Client: Gazprom Neft Badra B.V.-Iraq)

Iraq

Electrical Supervisor(PMC)
Responsibilities:  Compliance in line with company HSE policy, rules and regulation including PTW, HSE procedures.  Participate in Safety walk through and implement corrective actions.  Preparation of Safety reports and submission to HSE supervisor and ensure that recommended control measures are implemented effectively.  Monitoring & ensure that quality requirements are determined and satisfied throughout all phases of project execution and comply with specifications, applicable codes & standards.  Issuances of NCR to the contractor if the relevant activity is not comply with project specifications & close-out after corrective action.  Conduct E&I system inspection as per Inspection and test plan(ITP) and ensure quality are fully comply as per quality procedures.  Technical review & coordinate of Method Statement, Task risk assessment (TRA)/JSA, Drawings, Project Specification/Procedures, Vendor documents developed by contractors.  Supervise and monitor field construction/commissioning activities, report daily progress achievements, Liaise and co-ordination within own and other areas/disciplines.  Attending periodic (daily/weekly) construction progress review meetings with contractors/sub-contractors and review three weeks look-ahead schedule.  Technical support in preparation of as-built drawings on completion of site works.  Witnessed SAT of electrical equipment like transformers, switchgears, generators, motors, cables, earthing & lighting system, HVAC System during pre-commissioning stage.  Witnessed MCC Loop check, Coordination with Vendor representative during pre-commissioning, commissioning and start-up logic check test for DCS/ESD System.  Witnessed uncoupled no load Test (Solo Run Test) of all process areas HT/LT motors in accordance with Vendor/project specification.  Witnessed Functional & Performance Test of Electrical equipment & system during commissioning stage.  Supervise and monitoring all interface activities for safe operation of Pre-commissioning, commissioning & start up of Plant.  Performed System/Sub-system walk down of E&I discipline and preparation/clearance of punch list.  Review E&I System/Sub-System Construction Completion Certificate/ Mechanical Completion Dossier and approved Mechanical Completion Certificate.  Supervise & monitor punch list coordinator for integration in Project Punch List System.  Assist the commissioning and start-up team during commissioning and start up for safe operation of plant operation.
October 2012April 2013
7 months
Saipem spa
Electrical Commissioning Supervisor
Responsibilities:  Adherence to site safety rules & regulations including permit to work systems, Isolation and Lock out Tag out (LOTO) procedures.  Carry out electrical activities site inspections at per inspection and Test Plan to monitor the quality of work being performed at the site.  Installation of electrical equipment(i.e. Transformers, switchboards(PMCC/MCC), Power/Control Cables, Distribution boards(DB’s), Junction Boxes(JB’s), cable trays, earthing / lighting / HVAC / Heat tracing system and packaged electrical equipment as per project approved drawing & specifications.  To perform Site Acceptance Test (SAT) of electrical equipement like transformers, switchgears, generators, motors, Hi Pot test of cables, earthing & lighting system, HVAC System during pre-commissioning stage.  Loop checking/MCC loop checking coordination with Vendor/Client for DCS system during pre-commissioning and commissioning.  Performing system/sub system walk down of Mechanical completion, Ready for Commissioning (RFC) & clearing punch list activities.  Perform Punch list preparation of E&I equipment’s, Vendor Package Units and clearing job with Client/Vendor representative.  Reviewing and Compiling “As Built” drawings based on the design changes.
March 2010April 2012
2 years 2 months
Nama Mott macdonald(Client-Abu dhabi company for onshore oil operation)
Electrical Commissioning Engineer(PMC)
Responsibilities:  Monitor the Safety of all Site Personnel, Equipment, and the protection of property associated with daily Construction Activities, and Immediately Take Corrective Action.  Approve and monitoring ADCO PTW (Permit to Work) system & Follow HSC Plan acting as Area Authority & Issuing Authority for the same.  Monitoring & review QA/QC requirements are determined and satisfied throughout all phases of project execution and comply with specifications, applicable codes & standards.  Issuances of NCR to the contractor if the relevant activity is not comply with project specifications/procedures or deviation of specifications/procedures & close-out after corrective action.  Conducting WMS/TRA (Task Risk Assessment) meetings with the Contractors & Sub-Contractor representatives to ensure all the hazards are controlled & HSE requirements are maintained.  Coordination with the ADCO operation teams to plan & arrange permit to work for construction activities in non-restricted and restricted areas.  Obtain a Communicative Relationship with the EPC Contractors Site Supervision in Regard to the Daily Construction Planning, Identify Any Hindrance or Potential Schedule Delays, and Communicate to the PMC Superintendent.  Supervision and monitoring of all construction, pre-commissioning & commissioning activities in compliance with project specification, project quality & HSE Plan and international code and standards.  Construction, commissioning & start-up of Main Intake Sub-station and Gas Compression stations.  Electrical Work- 33 kV Over Head Lines (OHL) of 24 km construction & commissioning activities as per the project specifications, Project Quality Plan & approved work method statement.  Witnessing of all electrical SAT, Instrument & MCC Loop checking, Motor Solo run Test, Functional Test of various equipment.  Punch list preparation and attending punch clear jobs.  Post commissioning activities include system handover, completion of as-built drawing and project documentation.  Supervision of mechanical completion, reinstatement and plant handover activities and make sure that the punch lists works are performed correctly and rapidly.
May 2009January 2010
9 months
Aarvi Encon Pvt Ltd(Client: Cairn Energy India Ltd)
Electrical commissioning Engineer(PMC)
Responsibilities:  Approve and monitoring CEIL Permit to work system & follow HSC plan acting as Issuing authority for the same  Monitor the Safety of all Site Personnel, Equipment, and the protection of property associated with Pre-commissioning/ Commissioning activities and Immediately Take Corrective Action.  Preparation of punch lists and attending punch list jobs.  Pre-commissioning/Commissioning and hook up activities of power & utility plant, Switchboard(MCC), Junction box(JB), Distribution box(DB), Transformers, PMCC, Cathodic protection system, Heat Tracing System, Battery charger & UPS and Earthing System.  Commissioning of High Voltage 1000 KW, 3.3KV/750KW motors, commissioning and startup of electrical substations up to 33KV.  Witnessing of SAT of various electrical equipments and vendor package items of gas plants.  Witnessed MCC Loop check, Logic check test, Assist vendor representative for Package Equipment item for DCS System.  Functional test of UPS System, Lighting system, HVAC System, Circuit breaker and relays  Perform uncoupled no load test(Solo Run Test) of plant motors as per vendor and project specifications.  Pre-commissioning /commissioning of 2X1.2MW emergency diesel generator.  Commissioning, hook up and documentation including primary and secondary injection of control bays, protection relays, schematic check, Testing of AC/DC distribution panels, protection and control panels.  Supervise & monitor punch lists clearance with various sub-contractors, material re-cancelation with the sub-contractors during commissioning of the project.  Co-ordination with clients and pre-commissioning (GOCCM) documentation activities.  Responsible for all the safety rules and regulations application during Commissioning Execution.  To assist construction departments by defining of priority systems according with overall construction and pre-commissioning & commissioning planning and schedule.  Post commissioning activities include system handover, completion of as-built drawing and GOCCM documentation.
March 2008May 2009
1 year 3 months
Infratech Energy (Client: Reliance Industries Ltd(Export Refinery Project)
Electrical Construction Engineer
 Coordinate with testing engineer/vendor for hi pot test of HV cables, primary and secondary injection testing of breaker, protective Relay logic and set point, CT saturation test.  Verifying construction drawings and making necessary site instruction for any site modifications.  Commissioning and startup of New Main Intake Substation with 3500A Areva HV Panel including Generator control relay panel.  Performing walk down and following the punch list clearance for Utilities Interface Systems.  Post procurement activities include co-ordination, field support, site acceptance testing and Commissioning.  Post commissioning activities include system handover, completion of as-built drawing and project documentation.  Supervise Technicians, Equipment Vendor’s representative and other support trades labour during pre-commissioning and commissioning activities.  Site supervision and monitor construction of electrical item MV & LV Switchgear, transformer, MCC, cable laying & termination, lighting, cathodic protection etc.  Supervise and monitor field construction activities, report daily progress achievements. Liaise and co-ordination within own and other areas/disciplines.  Ensure that all work is carried out in accordance with project specification, procedure, and schedule, Determines manpower requirements for the defined scope and schedule.  Study look ahead to identify potential interface problems & suggest preventive measures.  Enforce quality and ensure that the construction follow the good industrial practices to avoid and eliminate reworks.
February 2007February 2008
1 year 1 month
Bechtel & Co.LLC(Oman)
Electrical Commissioning Supervisor
 Ensured compliance with Bechtel Standards and adherence to Bechtel PTW system/ HSE Policy.  Reporting violation of Project procedure, specification and unsafe practices.  Responsible for erection & commissioning of plant electrical equipment’s.  Executed 220/33KV GIS Sub-Station, 33/11KV & 11/0.425KV Indoor substations.  Carries out supervise/co-ordinate/Tools box talk with subcontractors/vendors activities of all E&I equipment under installation like switch gears, LV motors, HV/LV transformers, VFD, UPS /Battery chargers, protection relays/motor controls, GE package equipment Gas turbine generators.  Supervise & Witnessed site testing of switch yard and switch gear equipment’s such as current/Voltage transformer, circuit breaker, isolators, earthing switch & lighting arresters & VFD.  Supervise & monitor Cable tray installation, lighting & earthing system, Cable Laying, glanding, terminations , cathodic protection installation on site.  Supervise & witnessed HV testing of power cables and switchgear bus bars.  Installation of emergency power generator & assist vendor with testing & commissioning of emergency power generators.  Installation, Cabling and Assisted vendor with Commissioning of Monorails and Over Head Cranes.
August 2000February 2007
6 years 7 months
Siemens LTD(India)
Electrical Engineer
• Installation, testing & Commissioning of 220/66KV, 132/66KV, 66/11KV, 33/11KV Sub-Station & associated switchyard works. • Comply of client safety policy, rules & regulation & HSE Procedures on site. • Involved in Design Engineering drawings & other documents review, Material requisition, Quality inspection & control of materials, Co-ordination of Manpower mobilization with subcontractor for execution of entire project. • Installation of EHV/HV/LV Switchgear, Current Transformer, Voltage Transformer, Circuit Breakers, Isolators, Capacitor Bank & Harmonic filter reactor, Power & Distribution Transformers, MCC, Distribution boards, Bus-Duct, UPS & Battery system, earthing system, lighting & F&G System, Cathodic protection system. • Involved in Cable tray installation, Cable laying, termination & testing of various Power/Control cables, building electrification works on site. • Actively involved & witnessed testing & commissioning of electrical equipment like Transformers, Switchgears, CT/PT, Motors, Earhing systems, Bus-ducts, Control cables & Hi-pot testing of Power cables. • Ensure electrical installation & commissioning activities are performed in line with project specification, local authority regulations & international recognized standards.

Skills

Skill proficiency levels
MS Outlook
Construction
Construction Management
Pre commissioning
Commissioning & Start up
Inspection
Start-up project
Analytical skills
Testing
Project management

About me

Making new friends Enjoying natural beauty Listing music

Higher education

2000
Maharaja Sayajirao University
Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies

Languages

HindiNative


EnglishC2 — Proficiency


Professional development, courses

2018
CompEx/ATEX Modules(EX01, EX02,EX03,EX04) Certificate no: 59657
JTL, Hazardous Area
2011
 IOSH(The institution of Occupational Safety and Health) Managing Safety in construction site
TUV Nord, IOSH
2008
Industrial Automation Engineer
SOFOCON India Pvt Ltd, Industrial Automation

Citizenship, travel time to work

Citizenship: India

Permission to work: India

Desired travel time to work: Doesn't matter